I would expect that due to the possibilities of bacterial infection that
your health/safety authorities might insist on mud being removed by
specialist contracters and the cistern being infilled by concrete.
paul courtney
leicester
UK
Ron May wrote:
>Susan,
>
>Since the cistern is deeper than four feet, you will need to work with
>California OSHA for safety planning. They may require wearing a safety harness and
>having some sort of crane on hand to pluck you out if the sides cave-in.
>They may also require Hazardous Material training, breathing apparatus, steel
>toe shoes, and possibly shoring. These things can get complicated, but better
>that than a fatal accident.
>
>The U.S. Navy required me to retain a civil engineer to design a safe
>excavation that went below four feet. We had shoring, sump pumps, and wore hard
>hats, but CAL OSHA never inspected that site because it was on federal property.
>
>Ron May
>Legacy 106, Inc.
>
>
>
|
|
|